|
|
Rustenberg Platinum Mines 0-4-2 originally in association with In Scale Models of South Africa |
|
|
|
| This kit is considerably altered from the kit
received originally from South Africa with many alterations to make it
more comprehensive and easier to build. The kit includes wheels, gears
and motor. It features sprung suspension and includes both a flat brass
version of the boiler which the builder may roll or a resin cast one
that isready for use. |
|
First Run InfoThe first run of this model is completely sold out. |
|
Second Run InfoWork is progressing slowly on a second release which will in effect be a new kit entirely produced in the UK to remove all the bad design and poor quality the first run inherited from its south african origins. This will be an entirely EDM Models production.
There is no timescale for its release. With the first batch sold its likely that demand will be low for awhile so out other projects will come first |
|
hit counter |
E-mail for details |
|
|